Brighton Main Line

Brighton Main Line

A Southern class 377 Electrostar at Hassocks.
Overview
Type Commuter rail, Suburban rail
System National Rail
Status Operational
Locale Greater London
South East England
Termini London Bridge
London Victoria
Brighton
Operation
Opened 1841 (fully)
Owner Network Rail
Operator(s) Southern (Gatwick Express)
First Capital Connect
Depot(s) Selhurst
Brighton
Rolling stock Class 171 "Turbostar"
Class 319
Class 377 "Electrostar"
Class 442 "Wessex Electric"
Class 455
Class 456
Technical
No. of tracks 2-4
Track gauge Standard Gauge 1,435 mm (4 ft 8 12 in)
Electrification 750 V DC third rail
Operating speed 100 mph (160 km/h) maximum
Brighton Main Line
Legend
South Eastern Main Line
London Victoria
London Bridge
Spa Road
Victoria carriage sidings
Southwark Park
Grosvenor Bridge
South Bermondsey
Battersea Park
to North Kent Line
West London Line
to Kent Coast
SW Main Line
to Waterloo
Chatham Main Line
Inner South London Line
Latchmere Junctions
East London Line
Clapham Junction
New Cross Gate
Shepperton, Hounslow
Nunhead-Lewisham Link
Loop, Windsor Line
Brockley
and Reading
Catford Loop Line
SW Main Line
Honor Oak Park
Wandsworth Common
Forest Hill
Sydenham
Balham
Outer South London Line
Chatham Main Line
to Streatham Hill
to Sutton
Portsmouth Line
Penge West
Anerley
to London Bridge
Streatham Common
to Birkbeck
Norbury
Crystal Palace Line
Thornton Heath
Norwood Junction
Selhurst
Selhurst Depot
Wallington Line
to West Croydon
East Croydon sidings
East Croydon
South Croydon
Oxted Line
Purley Oaks
Purley
Tattenham Corner Line
Caterham Line
Quarry Line
Redhill line
Coulsdon North
Coulsdon South
Merstham tunnel
Quarry tunnel
M23 motorway
M25 motorway
Merstham
Merstham (L&BR)
Redhill
Redhill Tunnel
North Downs Line
Redhill to
Red Hill & Reigate Road
Tonbridge Line
Redhill sidings
Earlswood
Salfords
Horley
Gatwick Airport 2
Tinsley Green
(Gatwick Airport 1)
Three Bridges
Three Bridges to
Arun Valley Line
Tunbridge Wells
Three Bridges works
Central Line
Three Bridges sidings
Three Bridges sidings
M23 motorway
Balcombe tunnel
Balcombe
Ouse Valley Viaduct
River Ouse
Proposed (not built)
Ouse Valley Railway
Bluebell Railway to
Ardingly aggregates
Horsted Keynes
depot
Haywards Heath
Haywards Heath tunnel
Wivelsfield
Keymer Junction
East Coastway Line
Burgess Hill
Hassocks
Clayton Tunnel
Patcham Tunnel
Preston Park
Brighton depot
Cliftonville Tunnel
and carriage sidings
West Coastway Line
East Coastway Line
Brighton

The Brighton Main Line is a British railway line from London Victoria and London Bridge to Brighton. It is about 50 miles (80 km) long, and is electrified throughout. Trains are operated by Southern, First Capital Connect, and Gatwick Express, now part of Southern.

Contents

History and geography of the line

Original proposals

There were no fewer than six original proposals to build a railway between London and Brighton. The London and Brighton Railway (L&BR) emerged with an Act of Parliament of 15 July 1837, after a prolonged and expensive battle, for the most direct of these alternative routes. The scheme was to build a line from a junction with the London and Croydon Railway (L&CR) at Norwood to Brighton. The existing L&CR route from Norwood to London Bridge would also be used. One complication however, insisted on by the UK Parliament, was that the new railway should share its line between Croydon and Redhill with the South Eastern Railway main line to Dover. This clause in the act gave rise to sixty years of disputes between the two companies concerned.

Brighton line

The countryside between London and Brighton was largely rural. The new line was planned to traverse the North Downs, the Wealden ridge and the South Downs while avoiding steep gradients.

Due to the difficult terrain and relatively limited population between Croydon and Brighton, the line by-passed several towns and villages on the London-Brighton road, such as Reigate and Crawley. Even so, it required substantial earthworks, notably at Merstham, with one of the largest cuttings in Britain; seven tunnels (Merstham, Quarry, Redhill, Balcombe, Haywards Heath, Patcham and Clayton); and several embankments. There is also the 1,475-foot-long (450 m), 96-foot-high (29 m) Ouse Valley Viaduct near Balcombe.

The line was opened in two stages:

12 July 1841: Norwood Junction, London (L&CR) to Haywards Heath.
21 September 1841: the final section from Haywards Heath to Brighton.

Branch lines

The branch line from Brighton to Shoreham-by-Sea was finished on 12 May 1840, before the main line, as it did not involve significant civil engineering works (all the materials for the line having arrived by sea). The Newhaven section did not materialise until 1846, when the Brighton - Hastings line was opened by the Brighton Lewes and Hastings Railway. A few weeks later the L&CR, the L&BR and other railways in Sussex amalgamated to form the London, Brighton and South Coast Railway (LB&SCR).

Lines to Victoria

A branch line from Norwood to the resited Crystal Palace was built in 1851, extending to Sydenham in 1854, Balham and Wandsworth in 1856, Battersea in 1858, and London Victoria in 1860. A cut-off line reducing the distance between Croydon and Balham was opened in 1862.

Quarry line

There were frequent disputes resulting from the two companies' sharing of the busy section between Croydon and Redhill. The LB&SCR owned that section between Croydon and Coulsdon North, and the SER (later the South Eastern and Chatham Railway from Coulsdon to Redhill. Eventually the LB&SCR built an avoiding line between Coulsdon North and Earlswood which became known as the Quarry Line, and which is still used by fast trains avoiding Redhill. It was opened on 8 November 1899 (1 April 1900 for passenger traffic).

Electrification

The line was the first UK main line to be electrified throughout. The LB&SCR electrified its South London Line on 1 December 1909 using an overhead high-tension single-phase system; within three years the line from Victoria to Selhurst railway station was also converted, and in 1920, that from London Bridge to South Croydon. In 1921 plans were drawn up to extend overhead electrification to Brighton.[1] However, the 1923 grouping intervened and it only ever reached Coulsdon North, before the Southern Railway decided to standardise using the third-rail system of the former London and South Western Railway. Thus in 1928/29 the existing lines were converted to third-rail operation.

The decision to electrify the entire main line was taken in 1929, and the section from Coulsdon North – Three Bridges was opened in July 1932. That from Three Bridges – Brighton (and also to West Worthing) was operational from 1 January 1933.[2]

The third-rail system is electrified at 750V DC and in recent years had its power supply upgraded ready for the introduction of new Electrostar stock operated by Southern. Traction current supply for the whole route is overseen by Lewisham, Selhurst and Brighton electrical control rooms.[3]

Services

There are now many more trains from Victoria to Brighton than from London Bridge: a reversal of the original pattern. The line is four-tracked as far as Balcombe Tunnel junction, where it becomes a single pair through to Preston Park station. With the exception of a pair of platform loop lines at Haywards Heath station there are no passing places.

The fastest services from Brighton to Victoria call only at East Croydon and Clapham Junction, though some "express" services also call at Gatwick Airport. First Capital Connect services from Brighton to London Bridge continue via the Thameslink route across London to Blackfriars, City Thameslink, Farringdon and St Pancras, and then on to Luton and Bedford.

The Gatwick Express also uses the Brighton Mainline, with non-stop services running between London Victoria and Gatwick Airport. A train departs in both directions every 15 minutes, with a journey time of 30 minutes. Six weekday peak-hour Gatwick Express trains are extended to or from Brighton, up to London in the morning (calling at up to five other stations along the way) and down to Brighton in the evening.

Contingency options

From Balcombe Tunnel junction southwards to Preston Park station the tracks reduce from two pairs of running lines to one pair.[4] Any train which failed in this section would cause major disruption, so two provisions are in place to keep the service running.

Bi-directional signalling

The line is divided into three sections of bi-directional signalling, which allows trains to cross over to the opposite line and run in the "wrong direction". These are:

Diversionary route

The section from Wivelsfield to Preston Park can be bypassed by turning eastwards on to the Lewes line at Keymer Junction. Once at Lewes, a reversing move is made and the train returns westwards to Brighton via the East Branch line, rejoining the main line at Montpelier Junction. This prevents the train from calling at Burgess Hill, Hassocks, and Preston Park.

Branching routes

From Victoria, the following other services use the line, but branch off where shown:

External links

References

  1. ^ Dawson (1921).
  2. ^ Bonavia (1987) 87-89.
  3. ^ Network Rail: Sectional Appendix module KSW2/LOR SO500 Sequence 010
  4. ^ "Quail Route Map 5". http://www.trackmaps.co.uk/book5.htm. 

Sources